Time to Install Air Conditioners in the Apartments
Warmer weather is just around the corner and it’s time to think about air conditioners. The common areas of each apartment building – the dining rooms, hallways and lounges – are air conditioned, but the individual apartments are not. Please note that this applies to Pavilion, Primrose Gardens, Terrace East and Terrace West only. We are not able to install individual air conditioners in Menno Home or Menno Hospital.
Residents who want air conditioning in their apartment must provide their own portable air conditioning unit. Please note the following process for getting your air conditioner installed. (If you want to purchase an air conditioner unit you’ll find the details below.)
- We are asking every resident to contact the Life Enrichment Team by April 22nd to let us know YES or NO regarding wanting an air conditioner installed.
- If YES, we need you to sign the work request at the front desk as the installation has a $36 fee.
- If NO, we still need you to inform us to ensure that no one gets missed.
- Once you have signed up, please ensure that your air conditioning unit (along with the extension cord) is in your suite, unboxed, ready to install by April 29th.
Installations are scheduled to begin on April 29th. Our plan is to complete this project by Mother’s Day (May 12th weekend); we’ll do our best. To ensure we get this done, please sign-up by April 22nd with the Life Enrichment Team.
Removals are tentatively scheduled for after Thanksgiving (approximately mid-October). We will communicate our disconnect plans closer to the date.
Any requests for installations received after April 22nd will be processed when our maintenance team has time.
Please note the following important information:
- Only PORTABLE A/C units are permitted in the suites. These are the type that vent through a hose; in-window units are not permitted.
- Only high-efficiency units up to 8000 BTUs are permitted. Large amperage/BTU units (greater than 11 amps/8000 BTUs) will trip the breakers.
- Menno’s Maintenance Team MUST install the units in each suite. The annual installation fee is $36.00 and includes removal of the unit after the hot season. We ask that units are removed during the winter months due to building envelope management.
- Residents must provide a 3-prong extension cord (minimum length of 6’). It must be rated for at least 11amps.
- The A/C unit must be unboxed and in suite with extension cord when request is made to Life Enrichment Team for installation.
Please contact the Life Enrichment Team at 604-851-4004 with any questions.